awn is Cut with sod cutter, chopped and packed ready for transportation.
T
he truck is packed 1031.33 Square meters sods per load: 26 sods down , 7 across, 17 high = 3094 units, 3 sods per square meter A total of 34300 sods were delivered transported to site.
T
he soil is predominantly clay with some course sand and stone. The area was allowed to rest for two weeks to allow the clay to settle. The following process was followed to prepare the area prior to the lawn being laid. The ground was prepared 1000 square meters per day. Once the soil had been disked and scraped we raked the area, removing surface rocks and stone
T
he area is then composted to help with the establishment of the sod and compacted with a roller.
L
awn is then transported to next 1000 square meter area and then packed using spacer tools.